D Y F R E N TDynamics >>SUN 1.0
No grid connection
D Y F R E N T
SUN 1.0
Dynamics >> the self-powered AI campus
>> Inside the box

Every layer of SUN 1.0, taken apart.

drag · pinch · tap a layer

Scenario

Time of day13:00
Explode0%
SeasonWinter design day

Layers >>top to bottom

Zoom >> Tesseract cross-section

Box-in-box hydrogen vault

H₂ escaped
0 g
Turned into water
0 g
Locked as TiH₂
0 g
H₂ in outer air
0.00%
What 4% meansHydrogen mixed into air can only catch fire once it reaches 4% of the air by volume. That is its lower flammability limit. Below 4% a spark does nothing.
Why it makes waterHydrogen and oxygen want to become water: 2H₂ + O₂ → 2H₂O. A flame is one way. A platinum or palladium surface is another: the gases meet on the metal and become water vapour with warmth, no flame, even below 1%.
The design ruleThe outer annulus holds air (21% oxygen), not pure oxygen, so a leak can never build toward 4%. The recombiner turns it into water and the titanium liner soaks up the rest as TiH₂.
Zoom >> Inside one cell

Electrolyzer cell

Current density (how hard it runs)2.00 A/cm²
Cell voltage
—
Efficiency (LHV)
—
kWh per kg H₂
—
H₂ per m² of cell
—
>> DYFRENT DYNAMICS · SUN 1.0 · patent pending

A data center that powers itself from sun, air and water.

Sunlight is the energy. Air and rain are the feedstock. Hydrogen and batteries carry the day into the night. No grid connection request, no fuel, no smokestack.

>> How the system got better

Upgrades from the patent baseline to SUN 1.0

Every patent component stays. These changes use parts that already ship today, and the numbers update with your site and scale.

>> The plant's brain

What SUN 1.0 runs on.

Three layers, each on the hardware that fits its job. The safety layer is fixed by law and physics. The optimizer, the part that decides every hour where the sun goes, is a real choice: it is light enough that a Mac could run it.

Optimizer computer options >>real specs

>> Hour-by-hour energy balance

Replay the plant through real weather, hour by hour.

Five measured years at this site (2019–2023): sun from PVGIS on a single-axis tracker, air and rain from NASA POWER. The plant is sized on all 43,824 hours and replayed here exactly: battery, hydrogen and water levels as they would have been.

Run conditions

Horizon
Real weather window
Start date-
Hydrogen reserve floor0.25 days

What the run shows

    Zoom >> 4 seconds of a training run

    The graphene layer eats the GPU power swings.

    Synchronized training jobs swing power by tens of percent in under a second. The supercapacitor bank absorbs the swing so the fuel cells and batteries see a flat line.

    Swing depth
    GPU cluster drawFuel cell + battery outputSupercap absorbs / releases
    >> What it takes to build

    From one 5 kW unit to a 1 GW AI factory.

    Pick a scale. Equipment, land, water, materials, vendors, capital and schedule recalculate for the site, design and case in the header.

    Bill of system

    Capital by subsystem

    Power plant only. GPUs and the data hall are separate.

    Materials list >>vendors, quantities, cost

    Schedule >>months to first power

    Race to energize

    Outcomes

      Team & supply chain

        Permits it removes >>and keeps

          Assumptions >>downside · base · upside, each sourced

          Edit any value in the active case column. Everything on the page re-runs.
          >> Investment committee view

          What it costs, what it earns, and when it beats the grid.

          A 25-year project-finance model on the plant, then the owner's view: what powering compute years early is worth against waiting for a grid hookup.

          How SUN 1.0 got cheaper >>price it must charge, lever by lever

          Levers

          Solar trackers
          Solar in service by Dec 31, 2027 (keeps solar §48E)
          Domestic content +10 pts (US-made, FEOC-clean)
          Energy community or brownfield site +10 pts
          100% bonus depreciation (owner with tax appetite)
          Base storage & fuel-cell credits (§48E 30%)
          45V: start construction by Dec 31, 2027
          Tariff mode
          Tariff charged to the data center—

          Sources & uses

          25-year cash flow

          Power revenueH₂ sales + 45VO&M + reservesDebt serviceEquity cash flow

          Sensitivity >>required tariff, downside ↔ upside

          Three cases side by side

          Beating the grid >>100% sun, no gas, no grid: price SUN 1.0 must charge vs the local grid, on real 2019–2023 weather

          Against the alternatives >>per kW of firm 24/7 load

          DYFRENT economics >>proposed license terms

          Annual detail

          >> Why now

          The constraint is the plug, not the money.

          The four largest hyperscalers guided to roughly $720–745B of 2026 capex. Texas froze new large-load grid connections and then state permits. Ohio's utility bills data centers for 85% of contracted power for 12 years. A new gas turbine ordered today arrives around 2031. A building that never asks the grid for anything skips every one of those lines.

          ERCOT large-load queue
          474 GW
          5× Texas peak demand
          Grid wait, major markets
          3–7 yrs
          PJM avg 8 yrs in queue (2025)
          Gas turbine backlog
          116 GW
          GE Vernova, delivery ~2031
          Revenue per AI GW
          $10–12B/yr
          what every year of waiting costs

          Texas

          JUN 2026
          San Marcos bans data centers citywide. Abbott directs PUCT and ERCOT on large-load costs.
          AUG 3 2026
          Grid connections frozen for new 75 MW+ loads pending an ERCOT audit.
          SEP 14 2026
          Water-use reporting enforcement on data centers.
          SEP 21 2026
          TCEQ halts all data center permits, off-grid gas sites included.
          OCT 8 2026
          SB 6 rule in force: site control, self-funded upgrades, remote curtailment for 75 MW+.
          NOV 2026
          Governor-elect Hinojosa pledged a moratorium on all data center approvals.

          Ohio

          2023 → JUL 2025
          AEP Ohio pauses new data center hookups until its large-load tariff is approved.
          TARIFF
          25 MW threshold, 12-year contract, 85% minimum bill.
          MAY 27 2026
          DeWine pauses new data center sales-tax exemptions after the break cost ~$1.57B in one year.
          NOV 2026
          Governor-elect Acton ran on a conditional moratorium. 55% of Ohio adults oppose new construction.

          The SUN 1.0 answer

          • No interconnection request. Nothing enters the ERCOT or PJM queue, the SB 6 audit or an AEP minimum bill.
          • No combustion. Electrolyzers and fuel cells burn nothing, so there is no turbine air permit.
          • No municipal water. Rain off the solar field, water from air, and fuel-cell water returned to the loop.
          • No curtailment exposure. A site off the grid cannot be remotely disconnected in a grid emergency.
          • Flat power for spiky AI. The graphene bank absorbs training swings on site.

          Who needs this right now >>ranked by fit

          Sources